Council has reconstructed Mitchell Parade, Pascoe Vale South between Bell Street and Vaux Street.

The works comprised:

  • Construction of a new underground drainage system and pits.
  • Reconstructing the existing concrete kerb and channel. The levels have been altered to flatten the road and improve vehicle access into properties.
  • Laying of a new asphalt road surface.
  • Reconstruction of vehicle crossings between the new kerb and footpath edge.
  • Reinstatement of nature strips.
  • Total length: 535 metres.

Budget and timelines

  • Budget: $665,000
  • Construction start date: September 2017
  • Construction end date: January 2018